This website uses its own and third-party cookies to improve our services and collect information about your browsing. If you click "accept" or continue browsing, we will consider that you accept the use and installation of your device or device. You will find more information in our Cookies policy.

News

News

20/10/16

NEW PITLESS SOLUTION

EH-1500 with 100mm PIT for loads up to 2000kg

NEW PITLESS SOLUTION

In response to the demand of several markets, HIDRAL has developed a PITLESS solution for BIG LOADS.

The need of a pit often makes difficult the installation process for several reasons like:

  • Increasing installation times (expensive installation)
  • Architectural constraints of the building.
  • Local standards because of intrinsic characteristics of the terrain. For example, presence of shallow water.

The first units have been manufactured for HIDRAL USA, who has already sold the first prototypes. In the picture, one of the first units already installed.

Instead of doing any digging on the facility floor, the plant owners has chosen to save the 100mm gap with a very short ramp with very low inclination.

This solution is now available for all markets. Ask your business partner for viability and price.